Quick answer
Who supplies cut-off machines in Kabul, Afghanistan?
Hurain Engitech & Trade (Palanpur, Gujarat, India) is a cut-off machines manufacturer, supplier and exporter serving Kabul. Orders ship FCL or LCL to Bandar Abbas or Chabahar (transit) in about 25–40 days, then 6–10 days by road inland, quoted FOB, CFR or CIF. Metal cut-off machines with 355 mm abrasive wheels for fabrication shops.
Why Kabul needs cut-off machines
The capital and main market. Cutters and saws for wood, tile, marble and steel are needed on every fit-out and fabrication job, along with replacement blades.
Afghanistan is a landlocked, agriculture-based economy supplied through Iranian ports and Central Asian corridors, with trading centred on Kabul, Herat and Mazar-i-Sharif.
Construction & infrastructure in Kabul
New housing, commercial and infrastructure projects across Kabul need finishing materials delivered on schedule — pipes and fittings, bathroom packages, tiles, electrical products and site tools — ideally from a single exporter with one set of documents.
In Kabul, contractors & builders and builders' merchants buy cut-off machines from us mainly for carpentry and furniture and tile, marble and granite installation.
Who buys cut-off machines: Contractors & builders · Builders' merchants · Real-estate developers · Infrastructure projects
Wholesale & retail distribution in Kabul
Distributors and retailers in Kabul import hand tools, cookware, stationery and electrical products in mixed containers, with retail-ready or private-label packing.
In Kabul, hardware stores and supermarkets buy cut-off machines from us mainly for steel and pipe cutting and forestry and landscaping.
Who buys cut-off machines: Hardware stores · Supermarkets · E-commerce sellers · Distributors
Typical uses: Carpentry and furniture · Tile, marble and granite installation · Steel and pipe cutting · Forestry and landscaping · Construction.
Delivery of cut-off machines to Kabul
- 1Export from Mundra or Kandla (Gujarat)Goods are inspected, export-packed and customs-cleared in India, usually within a day's drive of our Palanpur base.
- 2Sea freight to Bandar Abbas or Chabahar (transit)Indicative transit 25–40 days (Central Asia & Caucasus), FCL or LCL, on FOB, CFR or CIF terms.
- 3Inland to KabulAbout 6–10 days by road, arranged by your clearing agent or forwarder after customs clearance.
Transit times are indicative; the confirmed schedule is set out in the quotation.
Local support for buyers in Kabul
| Office hours | 24×7 — three 8-hour shifts, every day |
|---|---|
| +91 87809 43729 | |
| Phone | +91 87809 43729 |
| hurainengitechandtrade@gmail.com | |
| Languages | English, Hindi, Gujarati, Urdu |
| Quotation | USD (AFN equivalent on request), within 1–2 business days |
Importing cut-off machines into Kabul: local guide
Practical facts for buyers in Kabul, Afghanistan — working days, time difference, customs system, trade-agreement duty and the seasons to plan around.
| Weekend | Saturday–Sunday (many trading firms also work Saturday mornings) |
|---|---|
| Our office hours in your time | 24×7 — three 8-hour shifts, every day |
| Currency | Afghan afghani (AFN); quotations in USD |
| Trade agreement with India | No India-specific trade agreement; standard (MFN) duty applies |
| Plan orders around | Ramadan and the Eid holidays (dates move about 11 days earlier each year), when working hours shorten and clearance can slow |
Leading industries in Kabul
- Wholesale & retail distributionBuys cut-off machines: Hardware stores, Supermarkets, E-commerce sellers
- Construction & infrastructureBuys cut-off machines: Contractors & builders, Builders' merchants, Real-estate developers
Cut-Off Machines specifications for Kabul
Typical specification range for power saws & cutting machines; exact values are confirmed per order and matched to Afghanistan's import requirements.
| Blade sizes | 110 mm to 355 mm |
|---|---|
| Power | 600 W to 2400 W; petrol for chain saws |
| Materials cut | Wood, laminate, steel, aluminium, marble, granite, concrete |
Standards: IEC 62841-3, EN 61029, CE marking or the standard your project specifies. Banking, sanctions and transit conditions change often; confirm before ordering.
