Quick answer
Who supplies rotary drills in Kabul, Afghanistan?
Hurain Engitech & Trade (Palanpur, Gujarat, India) is a rotary drills manufacturer, supplier and exporter serving Kabul. Orders ship FCL or LCL to Bandar Abbas or Chabahar (transit) in about 25–40 days, then 6–10 days by road inland, quoted FOB, CFR or CIF. Standard rotary drill machines for wood, metal and plastic drilling.
Why Kabul needs rotary drills
The capital and main market. Drills and rotary hammers are the most-used power tools on construction and installation sites, with steady replacement and accessory demand.
Afghanistan is a landlocked, agriculture-based economy supplied through Iranian ports and Central Asian corridors, with trading centred on Kabul, Herat and Mazar-i-Sharif.
Wholesale & retail distribution in Kabul
Distributors and retailers in Kabul import hand tools, cookware, stationery and electrical products in mixed containers, with retail-ready or private-label packing.
In Kabul, hardware stores and supermarkets buy rotary drills from us mainly for construction and interiors and steel fabrication.
Who buys rotary drills: Hardware stores · Supermarkets · E-commerce sellers · Distributors
Construction & infrastructure in Kabul
New housing, commercial and infrastructure projects across Kabul need finishing materials delivered on schedule — pipes and fittings, bathroom packages, tiles, electrical products and site tools — ideally from a single exporter with one set of documents.
In Kabul, contractors & builders and builders' merchants buy rotary drills from us mainly for electrical and plumbing installation and automotive tyre shops.
Who buys rotary drills: Contractors & builders · Builders' merchants · Real-estate developers · Infrastructure projects
Typical uses: Construction and interiors · Steel fabrication · Electrical and plumbing installation · Automotive tyre shops · Furniture assembly.
Delivery of rotary drills to Kabul
- 1Export from Mundra or Kandla (Gujarat)Goods are inspected, export-packed and customs-cleared in India, usually within a day's drive of our Palanpur base.
- 2Sea freight to Bandar Abbas or Chabahar (transit)Indicative transit 25–40 days (Central Asia & Caucasus), FCL or LCL, on FOB, CFR or CIF terms.
- 3Inland to KabulAbout 6–10 days by road, arranged by your clearing agent or forwarder after customs clearance.
Transit times are indicative; the confirmed schedule is set out in the quotation.
Local support for buyers in Kabul
| Office hours | 24×7 — three 8-hour shifts, every day |
|---|---|
| +91 87809 43729 | |
| Phone | +91 87809 43729 |
| hurainengitechandtrade@gmail.com | |
| Languages | English, Hindi, Gujarati, Urdu |
| Quotation | USD (AFN equivalent on request), within 1–2 business days |
Importing rotary drills into Kabul: local guide
Practical facts for buyers in Kabul, Afghanistan — working days, time difference, customs system, trade-agreement duty and the seasons to plan around.
| Weekend | Saturday–Sunday (many trading firms also work Saturday mornings) |
|---|---|
| Our office hours in your time | 24×7 — three 8-hour shifts, every day |
| Currency | Afghan afghani (AFN); quotations in USD |
| Trade agreement with India | No India-specific trade agreement; standard (MFN) duty applies |
| Plan orders around | Ramadan and the Eid holidays (dates move about 11 days earlier each year), when working hours shorten and clearance can slow |
Leading industries in Kabul
- Wholesale & retail distributionBuys rotary drills: Hardware stores, Supermarkets, E-commerce sellers
- Construction & infrastructureBuys rotary drills: Contractors & builders, Builders' merchants, Real-estate developers
Rotary Drills specifications for Kabul
Typical specification range for drill machines & impact tools; exact values are confirmed per order and matched to Afghanistan's import requirements.
| Voltage | 12 V / 18 V / 20 V cordless; 230 V or 110 V corded |
|---|---|
| Chuck | 10 mm, 13 mm keyless; SDS-plus; SDS-max |
| Power | 350 W to 1700 W |
| Plugs | Type C, G, I, A/B as per destination |
Standards: IEC 62841, EN 60745, CE marking or the standard your project specifies. Banking, sanctions and transit conditions change often; confirm before ordering.
