Why 10th of Ramadan City needs hastelloy pipes & tubes
One of Egypt's largest industrial cities, with engineering, textile and food factories. Alloy and stainless pipe and tube carry corrosive, hot and high-pressure media; projects need traceable, mill-certified material and plants replace corroded spools.
Chemicals, fertilisers & petrochemicals in 10th of Ramadan City
Chemical and fertiliser plants in 10th of Ramadan City handle corrosive media, so they buy stainless and alloy piping, PTFE and graphite seals and lined valves, and ship finished product in HDPE drums and barrels.
In 10th of Ramadan City, petrochemical complexes and fertiliser plants buy hastelloy pipes & tubes from us mainly for oil & gas and refineries and petrochemical and fertiliser plants.
Manufacturing & plant maintenance in 10th of Ramadan City
10th of Ramadan City's manufacturing base buys power-transmission parts, tools and measuring instruments continuously. Distributors and plant stores value mixed-SKU consolidation and neutral or private-label packing.
In 10th of Ramadan City, factories & oems and mro distributors buy hastelloy pipes & tubes from us mainly for heat exchangers and condensers and marine and offshore.
Delivery of hastelloy pipes & tubes to 10th of Ramadan City
- 1Export from Mundra or Kandla (Gujarat)Goods are inspected, export-packed and customs-cleared in India, usually within a day's drive of our Palanpur base.
- 2Sea freight to Port Said14–22 days at sea to Port Said, in a full or shared container.
- 3Inland to 10th of Ramadan City1 day by road from Port Said to 10th of Ramadan City, handled by your clearing agent.
Order basics for Hastelloy Pipes & Tubes in 10th of Ramadan City
| Minimum order (MOQ) | Half container (about 10 tonnes, LCL) |
|---|---|
| Small / trial order | Smaller trial lots on request: tell us the quantity you need |
| Container load | 1 × 20 ft container holds about 20 tonnes; half container (LCL) about 10 tonnes |
| Price terms | USD; EXW, FOB Mundra or Kandla (Deendayal), CFR or CIF Port Said |
| Payment terms | 50% advance with order confirmation and 50% before dispatch against export documents; L/C at sight can be discussed for larger orders. |
| Lead time | Stock items are dispatched in a few days; made-to-order lots add production time, confirmed in the quotation. Sea transit to Port Said: about 14–22 days. |
| HS heading (indicative) | 7304 / 7306 / 7219: Steel tubes and pipes; flat-rolled stainless steel (varies by alloy). Confirm the full code and duty with your customs broker. |
| Packing | Items are rust-protected where needed (VCI paper, oil or grease), packed in cartons, boxes or wooden cases, and palletised on fumigated (ISPM-15) pallets. Carton marks, barcodes and private-label packing are available. |
| Quotation | Price, MOQ, packing and lead time within 1 to 2 business days of your enquiry |
Small enquiries are welcome. Need only 500–1,000 pcs, a sample lot or a trial order? Tell us the quantity you need and we will quote it.
Official sources for export rules, classification and standards
- DGFT — India's export policy, Importer-Exporter Code (IEC) and export rules
- Indian Customs (CBIC) — Customs tariff, HS classification and export procedure
- BIS — Indian Standards and product certification
- ISO — International standards (ISO / IEC)
- FIEO — Federation of Indian Export Organisations: export support and market information
Supplier checklist before you order hastelloy pipes & tubes
Eight things to confirm with any supplier, including us. The last row is the risk that is specific to this product.
| Check | What to confirm | What we do |
|---|---|---|
| Who you are buying from | Registered company name and address, GST number and Importer-Exporter Code (IEC); verify the IEC on the DGFT website. | Hurain Engitech & Trade, Palanpur, Gujarat, India. |
| Specification in writing | Grade, size, standard and finish of the hastelloy pipes & tubes on the proforma invoice, not only in chat. | Every dimension is confirmed against your drawing or sample before production. |
| Samples | Approve a sample, or photos of the actual lot, before paying the advance. | Samples on request. |
| Quality proof | Test certificates for the lot, and the right to a third-party inspection before shipment. | Inspection before dispatch and test certificates or a certificate of analysis with the lot. |
| Packing and marking | Export packing that survives sea freight, with the markings and labels you need. | Export packing for FCL or LCL, with marking as you instruct. |
| Export documents | Commercial invoice, packing list, bill of lading and certificate of origin, with the HS heading (7304 / 7306 / 7219) on the invoice. | Full export documentation with every shipment. |
| Price, terms and timing | Incoterm and port, payment terms and lead time agreed in writing. | EXW, FOB, CFR or CIF; payment and lead time stated in the quotation. |
| Product risk: Wrong grade or lost traceability between heat number and certificate | Ask for the mill test certificate (EN 10204 3.1), check heat numbers on the pipe, and agree a PMI (alloy) test if needed. | Confirmed with you before production. |
Importing hastelloy pipes & tubes into 10th of Ramadan City: local guide
Goods for 10th of Ramadan City clear Egypt customs at Port Said. See the Egypt import guide for hastelloy pipes & tubes for duty, holidays and the customs system.
Leading industries in 10th of Ramadan City
- Manufacturing & plant maintenanceBuys hastelloy pipes & tubes: Factories & OEMs, MRO distributors, Maintenance contractors
- Textiles, garments & fashion retailAlso buys: Fabric wholesalers, Garment makers, Boutiques & retailers
- FMCG, beverages & packagingAlso buys: Beverage & water bottlers, Food processors, Personal-care brands
- Chemicals, fertilisers & petrochemicalsBuys hastelloy pipes & tubes: Petrochemical complexes, Fertiliser plants, Speciality chemical makers
Hastelloy Pipes & Tubes specifications for 10th of Ramadan City
Sizes and grades are listed on the Hastelloy Pipes & Tubes page.
