Quick answer
Who supplies metallic gaskets in Tartus, Syria?
Hurain Engitech & Trade (Palanpur, Gujarat, India) is a metallic gaskets manufacturer, supplier and exporter serving Tartus. Orders ship FCL or LCL to Tartus in about 7–15 days, quoted FOB, CFR or CIF. Spiral wound, ring-type joint (RTJ) and kammprofile gaskets for high-pressure flanges.
Why Tartus needs metallic gaskets
Port with a cement plant and oil terminal. Gaskets and gland packing are replaced whenever a flange is opened or a pump is overhauled, so plants buy them by the hundred before every shutdown.
Syria's economy is focused on reconstruction, with demand for building materials, power equipment and industrial spares around Damascus, Aleppo and Homs. Latakia and Tartus are the ports.
Oil, gas & petrochemicals in Tartus
Oil and gas operations in Tartus run on pressure-rated pipe, valves, flanges and gaskets that must be traceable to a mill certificate. Shutdown and turnaround work creates sudden demand for large mixed lists — exactly the orders we consolidate into one shipment.
In Tartus, upstream oil & gas and refineries buy metallic gaskets from us mainly for pumps and valves and pipeline flanges.
Who buys metallic gaskets: Upstream oil & gas · Refineries · Petrochemical plants · Fuel depots
Marine, ports & fisheries in Tartus
Marine and port operators in Tartus buy corrosion-resistant alloys, pumps and seals that survive salt-water service.
In Tartus, shipyards and port operators buy metallic gaskets from us mainly for heat exchangers and hydraulic cylinders.
Who buys metallic gaskets: Shipyards · Port operators · Fishing fleets · Offshore services
Typical uses: Pumps and valves · Pipeline flanges · Heat exchangers · Hydraulic cylinders · Gearboxes and motors · Refinery and chemical plants.
Delivery of metallic gaskets to Tartus
- 1Export from Mundra or Kandla (Gujarat)Goods are inspected, export-packed and customs-cleared in India, usually within a day's drive of our Palanpur base.
- 2Sea freight to TartusIndicative transit 7–15 days (Middle East), FCL or LCL, on FOB, CFR or CIF terms.
- 3Clearance at TartusTartus is itself the port of discharge, so goods clear customs locally and reach your warehouse quickly.
Transit times are indicative; the confirmed schedule is set out in the quotation.
Local support for buyers in Tartus
| Office hours | 24×7 — three 8-hour shifts, every day |
|---|---|
| +91 87809 43729 | |
| Phone | +91 87809 43729 |
| hurainengitechandtrade@gmail.com | |
| Languages | English, Hindi, Gujarati, Urdu |
| Quotation | USD (SYP equivalent on request), within 1–2 business days |
Importing metallic gaskets into Tartus: local guide
Practical facts for buyers in Tartus, Syria — working days, time difference, customs system, trade-agreement duty and the seasons to plan around.
| Weekend | Friday–Saturday |
|---|---|
| Our office hours in your time | 24×7 — three 8-hour shifts, every day |
| Currency | Syrian pound (SYP); quotations in USD |
| Trade agreement with India | No India-specific trade agreement; standard (MFN) duty applies |
| Plan orders around | Ramadan and the Eid holidays (dates move about 11 days earlier each year), when working hours shorten and clearance can slow |
Leading industries in Tartus
- Marine, ports & fisheriesBuys metallic gaskets: Shipyards, Port operators, Fishing fleets
- Cement & building materials plantsAlso buys: Cement and clinker plants, Grinding units, Block and aggregate plants
- Oil, gas & petrochemicalsBuys metallic gaskets: Upstream oil & gas, Refineries, Petrochemical plants
Metallic Gaskets specifications for Tartus
Typical specification range for seals, gaskets & gland packing; exact values are confirmed per order and matched to Syria's import requirements.
| Elastomers | NBR, FKM (Viton), EPDM, silicone, neoprene |
|---|---|
| Packing materials | Graphite, PTFE, aramid, ramie, graphite-PTFE hybrid |
| Gasket types | Spiral wound, ring joint, kammprofile, CAF, PTFE, rubber |
| Temperature range | −200 °C to +650 °C depending on material |
Standards: ASME B16.20, ASME B16.21, ISO 3601, DIN 3760 or the standard your project specifies. Check current sanctions and payment routes before ordering.
